RABENSTEINER
CHRONICLE
2021
Purchase of a new CNC measuring machine
The CNC measuring machine park was expanded by a ZOLLER genius >>pilot 4<<. Non-contact high-end measurement, another investment in the future.
2021
ISO 9001:2015 Recertification
Successful recertification according to ISO 9001:2015 Quality Management System.
In the service of the customer!
2020
Environmental certification ISO 14001:2015
Successful certification according to ISO 14001:2015 Environmental management system.
For the sake of the environment!
2020
WE REMEMBER
Our long-time and good soul of the first hour,
Ms. Klaudia Hofmann, unfortunately passed away much too early.
REST IN PEACE – WE MISS YOU!
2019
Machine park expansion
Purchase of a Swiss TTB high-precision grinding machine "Evolution".
Absolute maximum precision from Ø 0.02 mm.
2014
Move to new company building
After more than a year of construction, we moved into the new fully air-conditioned company building.
Production and office building were merged from two locations into one.
2013
Start of construction of new company building
In July 2013 was start of construction of the newly planned company headquarters and production facility to be occupied in mid-2014.
An important step into the future.
2012
WE REMEMBER
We bid farewell to our dear colleague,Ingrid Huemer-Stern, who left us far too early.
REST IN PEACE – WE MISS YOU!
2011
Machine park expansion
Machine park expansion with a SAACKE CNC UWIF 5-axis tool grinding machine with increased spindle power.
2008
First export catalogue
Creation of the first multilingual export catalogue on the manufacturing programme.
The export campaign starts.
2008
Machine park expansion
The CNC machine park was expanded to include another SAACKE UWIF precision tool grinding machine with chain loader for series production.
2006
Expansion of CNC machinery
The area of CNC cylindrical grinding was expanded. A STUDER CNC S33 from Switzerland was purchased.
2005
Trade fair participation at Austrotec
Trade fair presentation in Graz at AUSTROTEC 2005.
Followed by further trade fair participations (INTERTOOL, ViennaTec, Frontale, ...)
2003
Machine park expansion
Machine park expansion with a WALTER Helitronic Power CNC tool grinding machine.
Especially for surgical instruments.
2003
Implementation of ISO 9001:2000
Implementation of the ISO 9001:2000 quality management system by Lloyd's Register Vienna.
Auditor Mr. Ing. Norbert Moschini – LRQA.
2002
Purchase of a CNC measuring machine
Acquisition of the first ZOLLER CNC measuring machine genius3 with image processing sold in Austria.
Delivery after premiere at Intertool 2002 in Vienna.
2001
Machine park expansion
Constantly increasing quantities require the expansion of the CNC machine park with a SAACKE UWII with loading system.
1998
Change in the management
Hans Rabensteiner is appointed as the new Managing Director and successor.
1998
Change in the company management
Hans Rabensteiner Sen. hands over the reins of the company to his son Hans Rabensteiner.
1996
Entry into medical technology
Production of surgical instruments with CNC grinding technology. Bone marrow rasps/drills and mills for hip arthroplasty.
1992
Machine park expansion
Machine park expansion with a WALTER Helitronic CNC tool grinding machine.
Especially for surgical instruments.
1991
Machine park expansion
The area of cylindrical grinding was expanded. A STUDER S S33 from Switzerland was purchased.
1990
Acquisition of Steyr grinding plant Daimler Puch AG
Purchase of the complete tool grinding plant of Steyr Daimler Puch AG in 4523 Letten and integration of the mechanical equipment.
1977
Construction of company location
Hans Rabensteiner built the first office and sales building at Schiedlbergerstrasse 10 in 4522 Sierning.
1969
Foundation
Foundation of a tool trading company by Hans Rabensteiner.
Opening in Neustrasse in 4522 Sierning.